< Back to News & Insights

30/07/2026

JBA Completes EPCM for Regulated Site

JBA are proud to see the opening of the DEScycle facility here in Teesside.

Over the past three years, we have supported DEScycle in developing and scaling up their process at Wilton International, delivering a fully operational pilot facility in just 16 months. It has been a privilege to support DEScycle and showcase the engineering capability that exists here in our region.

JBA delivered the project on a full EPC basis, drawing on our extensive engineering and construction teams. We also worked with a strong regional supply chain for equipment and services, resulting in a facility that was designed in Teesside and built in Teesside.

A fantastic achievement for DEScycle, and one that everyone involved should be incredibly proud of. Congratulations to the whole team on bringing this facility to life.

 

Call to action title

Our latest day to day updates can be found on our LinkedIn profile.

  • List item 1
  • List item 2
Connect with us

Latest News

Got a question?

Have an engineering challenge to discuss? Get in touch with our team to see how JBA can support your project. 
You can call us on (+44) 01740 665730 or email enquiries@jbaengineering.com